Extension of the purposeful removal of nutrients.Measures aimed at optimizing the slud-ge treatment, digester gas utilization, enhanced biological phosphorous re-moval (Bio-P), sewage filtration as well as adjustment of process control technologies
SUBPROJECT: Extension of the aeration basin capacity by using fixed beds (ring lace)Enhanced chemical and biological phosphorous removal; Sand filtration (materials to be filtered < 5 mg/l)Sludge treatment: thickening, anaerobic mesophilic digestion, drainageDistrict
[heading title="Description"]
Extension of the purposeful removal of nutrients. Measures aimed at optimizing the sludge treatment, digester gas utilization, enhanced biological phosphorous removal (Bio-P), sewage filtration as well as adjustment of process control technologies
Facts
Client: Amperverband, Bayern, Germanybw-engineers Member Company: Weber – Ingenieure GmbH
Project Volume: 22,0 million Euro (Subproject: 2,5 million EURO)
Construction Volume: Project Volume (z. B. “approx. 6,0 million Euro”)
Project Duration: 1998 – 2010
Services
Water and EnvironmentWastewater Treatment